Artificial Grass Cement Concrete Foundation


1, on the surface of the flatness of the higher requirements to ensure that artificial grass surface layer thickness, uniform elasticity. Flatness pass rate of 95% or more,


5m ruler error 3MM, slope: horizontal 8 ‰, vertical 5 ‰, semi-circular area 5 ‰, the surface should be flat and smooth, to ensure drainage.


2, the basis should have a certain intensity and stability.


3, the surface is uniform and solid, no cracks, no bad side mahjong, the joints straight and smooth, with about 6000mm × 6000mm cut as well.


4, cushion compaction, compaction greater than 95%, after the pressure in the medium-sized roller compaction, no significant wheel tracks, no loose soil, waves and so on.


5, the cement foundation must have a water-impermeable layer, water-proof layer of new PVC thick waterproof membrane, the junction should be greater than 300mm, edge margin greater than 150mm.


6, need to consider leaving expansion joints, the width of 5 mm.


7, the basic maintenance period of 2-3 weeks.